Migration Plan
Legacy system transition with batch processing, validation, and rollback
Migration Phases
90-day dual operation for reconciliation (Day 62)
Total Rows
0
across 0 batches
Valid
0
0% pass rate
Errors
0
requires manual review
Avg Accuracy
0%
target: 98.0%
Migration Batches
| Batch | Source | Date | Rows | Valid / Error | Accuracy | Status |
|---|
Migration Safeguards
Each batch has a rollback checkpoint. Executed batches can be reversed within 48 hours. All batches require Director approval before execution. Error rows are quarantined and can be re-processed after correction.