Migration Plan

Legacy system transition with batch processing, validation, and rollback

Parallel Run Day 62/90

Migration Phases

90-day dual operation for reconciliation (Day 62)

Total Rows

0

across 0 batches

Valid

0

0% pass rate

Errors

0

requires manual review

Avg Accuracy

0%

target: 98.0%

Migration Batches

BatchSourceDateRowsValid / ErrorAccuracyStatus

Migration Safeguards

Each batch has a rollback checkpoint. Executed batches can be reversed within 48 hours. All batches require Director approval before execution. Error rows are quarantined and can be re-processed after correction.